Unfortunately the van broke down while I was here so we ran out of time to lay the cobblestone flooring Greg wanted. This can be finished off when I return with the completed greenhouse in a few weeks.
1 Comment
Greg Elphick
15/8/2018 09:17:03 am
Should any prospective customers worry about hiccups on a build, rest assured that NOTHING stops Robin! He starts early, finishes late and is a really meticulous professional. Repeatedly running the length of the garden with a loaded barrow to push the job along did seem a bit excessive though. Can’t apologise enough for Neo’s Intervention when he saw Robin running in the garden, went bonkers, jumped up and nipped him on the leg. 🤭 “A mere flesh wound” responded Robin. Then cracked on. Neo watched from the closed patio doors from then on. Sorry. Again.